Aberdeen Western Peripheral Route

Client: Transport Scotland

Main Contractor: AWPR Joint Venture

Contract Duration: 20 months

Contract Value: £5.5m

Summary of Albion Works:

  • Largest ever road blasting contract to take place in Scotland
  • Approximate volume of over 1.8 million m³ of rock blasted
  • Stabilisation of embankment supporting A93 at Milltimber
  • Stitch Drilling works throughout the site

Technical Difficulties:

  • Blasting within 50.0m of residential properties
  • Strict vibration limits
  • Close Proximity to Shell/BP pipeline
  • Blasting within 10.0m of A90 Dual Carriageway
  • Provision Design Consultancy Services